There are extreme problems with municipal waste disposal in some areas of Europe, particularly in southern Europe. We are aware of the problems, but the reality is that we don’t want to talk about them. In our experience, there are a number of municipalities that either have a non-functioning landfill or no landfill at all. The problem is that large quantities of residual waste accumulate and then have to be disposed of by sorting out the recyclable products and sending the non-recyclable products to a landfill. This also applies to the volume of mixed construction waste that accumulates on a daily basis.
With our mobile-modular processing concepts, we can dispose of mixed construction waste and municipal waste accordingly. These are flexible machines that can be designed and used according to requirements and fractions.
AN INVESTMENT THAT PAYS OFF.
- Future-proof solutions with mobile modular processing concept (MMPC)
- Processing of up to 30,000 tons of biowaste per year and plant possible
- Low investment volume
- ROI possible within just three years with the right volume
- Disposal costs can be reduced by up to 80
- Reduction of residual screenings from 15 % to less than 5 % possible (in relation to the input quantity)
- Flexible use of the machines
- Quick reaction to changing conditions